Granite installation is the work a 2025 Google review describes, and every material follows the same order: choose the stone with straight information about heat, stains and etching, plan seams and cutouts in the 3D presentation, then template and install once the cabinets are in. Bathroom vanity tops follow that sequence too.
This page compares the materials, the sizing choices, the cost factors and the care each stone needs. Keeping cabinets you like and only swapping the tops? Start with countertop replacement.
What Our Countertop Installation in Sarasota Covers
A countertop is the one part of a kitchen that cannot be adjusted once it is cut, so most of our scope happens before fabrication: comparing stone, drawing the top in 3D and templating on cabinets that are already set. The same list applies to kitchens, bars and bath vanities. Reconnecting water and drain lines is a licensed plumber’s job and appears separately.
- Side-by-side comparison of granite, quartz, quartzite and marble samples against your door style and finish
- Countertop layout drawn into the 3D presentation, showing overhangs, seam locations and splash height
- Templating scheduled after the cabinets are installed, shimmed and secured
- Cutout planning for undermount or drop-in sinks, cooktops, faucet holes and soap dispensers
- Edge profile and slab thickness selection
- Delivery and setting of the finished tops
- Bathroom vanity tops sized to new or existing vanity boxes
- Care notes for the specific stone you choose, including sealing guidance for natural stone
Which Kitchen Countertops in Sarasota Fit the Way You Cook?
All four stones look good on day one. The differences show up later, in how each surface handles a hot pan, a splash of lemon juice or olive oil left overnight. Here is how we lay out the trade-offs at the technical visit.
| Material | What it is | Heat | Stains and acids | Routine care |
|---|---|---|---|---|
| Granite | Natural igneous stone cut from quarried blocks | Tolerates hot cookware well | Porosity varies by slab; sealer slows absorption | Reseal when water stops beading |
| Quartz | Engineered: crushed quartz bound with polymer resin and pigment | Resin can scorch or discolor under direct heat | Non-porous and stain-resistant; strong sun can yellow some colors | No sealing; mild soap and water |
| Quartzite | Natural metamorphic stone formed from quartz-rich sandstone | Handles heat well | True quartzite resists acids; porosity varies | Usually sealed; test the slab before buying |
| Marble | Natural metamorphic stone formed from limestone or dolomite | Handles heat well | Etches into dull spots from citrus, vinegar and wine | Seal against stains; accept or hone away etching |

In most kitchen conversations, quartz and granite come up first. Quartzite and marble usually enter higher-end projects, where homeowners want natural veining and accept a little more upkeep in exchange.
What Gulf Coast humidity does to older countertops
Many Sarasota kitchens from the 1970s to the 1990s still carry laminate or tile. Humidity and sink splash swell laminate seams, grout darkens with mildew and cultured-marble vanity tops craze. A top lifting at the backsplash often means water has reached the cabinet below, so we check that before quoting stone.
Location matters as much as taste. For an outdoor kitchen or a sun-washed lanai bar, we generally point people to granite, because the resin in quartz can change color after long exposure to Florida sun.

Bathroom Countertops in Sarasota and Other Sizing Decisions
Most choices that shape a countertop are made on paper before a slab is cut. We draw them into the 3D presentation so you see the top sitting on your actual cabinet layout.
- Thickness. Kitchen tops are commonly 3 cm stone; some vanity tops use 2 cm. Thickness changes how the edge reads and how much weight the boxes carry.
- Overhang. Island seating needs knee room, and deeper overhangs usually need concealed steel supports or corbels, which we build into the island cabinet plan.
- Seams. Slabs come in finite sizes, so long runs and L-shapes need joints. We keep them away from sinks and cooktops where the layout allows and show you where they land.
- Edge profile. Eased and square edges suit flat slab doors; bevels and ogees suit raised-panel styles.
- Splash. A short stone splash, a full-height slab or tile, each decided before templating.
Vanity tops follow the same logic at a smaller scale. Bowl size, faucet spread and vanity depth decide what fits, and we size the top to the cabinet rather than forcing the cabinet to suit a stock top. Our bathroom remodeling page covers the rest of that project.

Countertop Fabrication and Installation: Why Cabinets Come First
Stone is the last measurement in a kitchen, not the first. The custom cabinets go in, get shimmed level and fastened to the wall, and only then is the countertop templated. A template taken from a drawing can miss a bowed block wall or a floor that drops toward a slider.
At templating, the sink and any cooktop or faucet specifications need to be on hand so cutouts match the real products. The template goes to the fabrication shop, the slab is cut and its edges finished, and the pieces return for installation. Across the trade that gap commonly runs from several days to a few weeks; we confirm your dates once the stone is chosen.

Setting the sink into the new top is part of the install. Reconnecting the drain and supply is plumbing work, and if a sink or range moves, those lines are rerouted under a permit by a plumber licensed in Florida. We flag that at the technical visit and coordinate with your plumber or general contractor; licenses can be checked at myfloridalicense.com.
Planning cabinets and countertops together? Call (239) 545-0550 to book a technical visit.
Call (239) 545-0550What Moves Countertop Prices, and How Do You Care for Stone?
We do not publish prices, because two kitchens of the same size can land far apart. These are the factors that move the number:
- Material and slab grade, including how rare the color or veining is
- Total square footage and the number of separate pieces; an L-shape plus an island can need a second slab
- Book-matched or vein-matched layouts, which use extra stone to line up the pattern
- Edge profile, thickness and any mitered or waterfall ends
- Number and type of cutouts; an undermount sink needs a polished cutout, a drop-in does not
- Full-height splash versus a short splash or tile
- Removal and disposal of existing tops
- Access: condo elevators, stairs and long carries from the truck
The cabinets underneath add two more variables. A seating overhang deeper than the stone can carry alone needs hidden steel supports or corbels, and lifting an old tile splash can uncover drywall or block repairs before the new top goes on. Small vanity tops, on the other hand, can often be cut from a remnant, which changes the slab math.
Care by material
Wipe any stone daily with warm water and a pH-neutral cleaner. For granite, drip a little water on the surface; if it darkens within a few minutes instead of beading, reseal. Give quartz a trivet for anything straight off the burner. Wipe acids off marble promptly and expect some etching over time. Seal quartzite as recommended and skip abrasive pads.

Countertop Permits, Plumbing and Condo Rules in Sarasota
A top swapped in place, with the sink staying put, is generally finish work. Moving a sink, adding a prep sink or wiring an island is plumbing or electrical work under Chapter 489, Florida Statutes: permitted by the City of Sarasota or Sarasota County Building Division, depending on the address, and done by a Florida-licensed trade (check at myfloridalicense.com). Condo associations usually add a remodel approval, elevator booking and set hours for hauling stone.
For a parcel outside city limits, the county now takes those applications at its One Stop on Apex Road, opened in March 2026. A gas cooktop set into a new run is fuel-gas work for a licensed plumbing or gas contractor, and when the sink base is replaced too, the disposal and dishwasher are reconnected by the plumber and electrician, not the stone installer.
Countertops services

Granite Countertops
Granite slabs chosen with you, templated on your installed cabinets and set with a simple plan for sealing.
Learn more →
Quartz Countertops
Low-maintenance quartz matched to your cabinet finish, with honest advice on heat and sun before you choose.
Learn more →
Marble & Quartzite Countertops
Quartzite and marble chosen with honest testing for etching and scratches, then installed on your new cabinets.
Learn more →
Countertop Replacement
New granite or quartz on cabinets worth keeping, after an honest check of the boxes underneath.
Learn more →From Technical Visit to Finished Countertops
- 1
Technical visit
We measure the kitchen or bath, note wall and floor conditions, look at the sink and appliances, and talk through how the counters get used day to day.
- 2
Material selection
You compare stone samples against your cabinet finish. For natural stone, viewing the actual slab is worth the trip, because no two are alike.
- 3
3D presentation
Countertops are drawn with the cabinets: overhangs, seams, edge, splash and every cutout, so you approve the whole room at once.
- 4
Cabinets, then template
Cabinets are delivered and installed. Once they are level and secure, the countertop is templated with the sink and fixture specs on hand.
- 5
Countertop installation
The fabricated pieces are set, seams are filled and leveled, and the sink is mounted. Your plumber then reconnects the water and drain.
Why Hire a Kitchen Countertop Company That Builds Cabinets Too?
One plan for boxes and stone
We design and install the cabinets and coordinate the countertops, so the template is taken on cabinets we set ourselves and one schedule covers both.
Granite installs clients have reviewed
A 2025 Google review describes an unhurried slab selection and an on-time, tidy granite installation in the reviewer’s kitchen.
See the top before it is cut
Seams, overhangs and edges appear in the 3D presentation made with specialized design software, before anything is fabricated.
5.0 stars from 28 Google reviews
Clients mention professional crews, clean work areas and deadlines that were met (Google, checked August 2026).
What homeowners say on Google
5.0★ average from 28 Google reviews · Read all reviews
“I recently had granite countertops installed by FT Cabinetry, and the experience was nothing short of fantastic. … The selection process was smooth, and I never felt rushed. Once I made my choice, the installation went flawlessly. The team showed up on time, worked quickly, and left everything looking beautiful.”
“I recently worked with … FT Cabinetry for my kitchen remodel, and I am thrilled with the results! The team was professional, attentive, and helped bring my vision to life. The quality of the cabinetry is outstanding, showcasing excellent craftsmanship and materials. Installation was smooth and efficient, leaving my home clean and tidy.”
“A responsible company that met deadlines and on time for the delivery and installation of the materials. And everything was of very high quality.”
Where we provide countertops
We install countertops with new cabinets across Southwest Florida from our Sarasota location. Many Gulf Gate block homes still have their 1960s kitchen layout, so granite there usually arrives with new cabinets. Compact kitchens in Sarasota Springs gain the most from careful seam and overhang planning. On Longboat Key, tower elevators and association work hours shape how pieces are sized and delivered, and in Bradenton we work in riverfront condos and older ranch homes alike.
- Countertops in Gulf Gate
Gulf Gate Estates subdivision near the Gulf Gate shopping district, where 1960s block homes often keep their original kitchen layouts.
- Countertops in Sarasota Springs
Established neighborhood of concrete-block homes in central Sarasota County, where compact kitchens benefit from smart storage.
- Countertops in Longboat Key
Town split between Sarasota and Manatee counties, lined with Gulf-front condo towers where associations govern work hours, elevators and debris removal.
- Countertops in Bradenton
County seat on the Manatee River with a historic downtown, riverfront condos and many 1950s-70s ranch homes.
- Countertops in Holmes Beach
Largest city on Anna Maria Island, where many ground-level homes and rentals took on water in Helene and again in Milton (2024).
- Countertops in Villas
Unincorporated area along US 41 south of Fort Myers, dense with condos and villas built from the 1970s to the 1990s.
- Countertops in Lakewood Ranch
Master-planned community spanning Manatee and Sarasota counties (34,877 people in 2020), mostly newer homes where builder-grade kitchens get custom upgrades.
- Countertops in Osprey
Bayfront community home to Historic Spanish Point and Oscar Scherer State Park, with Gulf-access estates and newer gated neighborhoods.
- Countertops in Venice
Island city planned by John Nolen in the 1920s with Northern Italian-style architecture, many retirees and condo communities.
Request a quote for countertops
The quickest way to start is a call to (239) 545-0550. Prefer to write? Send the basics and we will call you back.
Countertops: common questions
Do you template countertops after the cabinets are installed?
Yes. We template only after the cabinets are set, leveled and fastened, because stone cannot absorb a box that shifts later. A template made from drawings can miss a bowed wall or an out-of-level floor, both common in older Sarasota block homes. Have the sink and any cooktop on site at that appointment so the cutouts match the actual products.
Which countertop materials do you offer?
We help clients choose and install granite, quartz, quartzite and marble with their cabinets, for kitchens, baths, bars and laundry rooms. Granite is the material a recent client review describes. At the technical visit we cover the trade-offs, from quartz’s heat sensitivity to marble’s etching, so the stone suits how the room is really used.
How long after cabinets are countertops installed?
It depends on the material and the fabricator’s schedule. Across the industry, the gap between templating and installation commonly runs from several days to a few weeks. We confirm your dates once the stone is selected and the template is taken. The sink is usually out of service in between, so set up a temporary prep spot.
Can I keep my cabinets and only replace the countertops?
Often, if the boxes are level, solid and dry. Before recommending it we check for swelling under the sink, loose face frames and sagging runs. Stone is much heavier than laminate, so weak cabinets should be repaired or replaced first. This comes up often in Sarasota homes from the 1980s and 1990s with original cabinetry.
Do you install bathroom countertops in condos?
Yes. Vanity tops are templated and installed the same way as kitchen tops, just smaller. In condo buildings we plan around the association’s work hours, elevator reservations and hallway protection rules, and we size pieces so they fit the service elevator. Bring any association requirements to the technical visit so we can account for them.
Related services

Granite Countertops
Granite slabs chosen with you, templated on your installed cabinets and set with a simple plan for sealing.
Learn more →
Quartz Countertops
Low-maintenance quartz matched to your cabinet finish, with honest advice on heat and sun before you choose.
Learn more →
Marble & Quartzite Countertops
Quartzite and marble chosen with honest testing for etching and scratches, then installed on your new cabinets.
Learn more →Helpful guides

Quartz vs Granite vs Quartzite Countertops
A plain comparison of the three most requested countertop materials on heat, stains, etching, sunlight, seams and upkeep.
Read the guide →
Granite vs Quartz Countertop Cost in Southwest Florida
Slab grade, fabrication, edges, cutouts and installation details decide what granite or quartz really costs in a Gulf Coast kitchen.
Read the guide →